Fire Door Packages for Developers and Main Contractors

On a build or refurbishment, fire doors sit at the junction of several trades: the opening has to be ready, the doorset has to match the approved schedule and the records have to survive to handover. We price and deliver permanent fire door packages — supply and fit, and remedial works — for developers and main contractors working across the East Midlands.

What We Take On

Supply & fit

Doorset packages to schedule

Fire doorsets or leaves with frames and ironmongery, installed to the approved door schedule and the manufacturer's installation instructions.

Remedials

Putting existing or snagged doors right

Adjustment, component renewal and replacement on refurbishments, or snag items left at handover, priced door by door.

Coordination

Working to your programme

Install windows and sequencing with follow-on trades agreed in advance, with openings that are not ready recorded for resolution.

Records

Close-out tied to door references

Installation records and product information organised by door reference for the handover file.

Design And Scope Inputs We Price From

A reliable price comes from the approved information, not from assumptions. We ask for the following before pricing and record any gaps as queries or provisional items.

Where the question concerns specification control rather than site coordination, see fire doors for architects and specifiers for applicable product evidence, written substitution approvals and the handover revision trail.

  • Door schedule: references, locations, ratings, smoke control, leaf sizes, hand and configuration
  • Ironmongery schedule and any access-control or hold-open interfaces
  • Drawings and wall types for each opening
  • Fire strategy or specification clauses affecting doors
  • Finishes, glazing and vision panel requirements
  • Programme window, phasing and required records at handover

Opening Readiness

Opening readiness affects fit, sequencing and programme. An opening should be built to the size and wall type the doorset requires, with the structure and linings ready to receive the frame. Openings should be checked against the approved information before fitting, and any unsuitable opening recorded and resolved with the main contractor before a frame is installed in it.

  • Structural opening size and squareness
  • Wall construction matching the schedule
  • Floor finish level and threshold detail agreed
  • Services, cabling and penetrations around the opening coordinated

Deliveries, Storage And Sequencing

Fire doorsets need dry, flat storage and protection after fitting. Delivery batches, storage location and who protects doors once installed should be agreed, with work sequenced around decorators, flooring and M&E trades. Order-to-site timescales depend on specification and supplier; general factors are covered in our lead times guide.

Variations And Snagging

Variations are priced and instructed in writing before the work, and recorded against door references. At the end of the package, snags should be logged door by door; our guide to fire door snagging in new-build buildings explains how to log them so they can be priced and closed.

Quality Checks And Handover Records

On completion we check and record gaps, alignment, seals, closing and latching for each door. What a handover file should contain is set out in fire door handover documentation. These checks are our installation quality checks; they are not a formal fire door inspection. If the client or project requires an independent inspection or report, it is arranged through a specialist external inspection partner.

What To Send For A Package Quotation

Send the door and ironmongery schedules, drawings, specification extracts and programme window through our contact form. We return a written quotation listing included doors, exclusions, provisional items, assumptions and VAT basis. For the general service, see fire door installation.

Related Pages

The pages that own installation, snagging, handover records and commercial work.

Frequently Asked Questions

Price Your Fire Door Package

Send the door schedule, drawings and programme window. We return a written, door-referenced quotation with assumptions and exclusions stated.