Findings
Formal inspector
Inspects doors and produces a written report of findings and priorities. For Parsec clients this is arranged through an external specialist partner.
Buyer's Guide
The right fire door contractor is the one whose scope, evidence and responsibilities are clear before work starts. These questions help you compare contractors on substance rather than price alone, and keep the inspector's role separate from the works contractor's.
Contractors can only be compared if they are pricing the same thing. Start from the source of the work: an inspection report, an FRA action list, a door schedule or a planned replacement programme. Give each door a reference and state whether you expect repair, replacement or a decision on site.
Where you do not yet have a formal inspection, decide whether you need one first. Parsec arranges formal inspections and reports through an external specialist inspection partner, so the findings are recorded independently of the works quotation.
Findings
Inspects doors and produces a written report of findings and priorities. For Parsec clients this is arranged through an external specialist partner.
Scope check
A Parsec visit to confirm access, dimensions and the works needed for our quotation. It is not a formal inspection report.
Delivery
Carries out the repairs, remedials, installation or replacement, and provides records against each door reference.
Ask the same questions of every contractor and keep the answers in writing. Useful questions focus on the work in front of you rather than general claims.
Score each quotation against the same criteria. A structured comparison makes gaps in scope visible and avoids choosing on the lowest total alone.
Every door reference covered, with a stated action for each rather than a single lump sum.
Named products or components, with instructions or documentation identified for the openings being supplied or altered.
Frame, lining, fixing and perimeter work stated or excluded, not left unclear.
Making good, decoration, disposal, out-of-hours work and unknowns listed clearly.
A workable sequence for occupied areas and a plan for doors that cannot be accessed.
Completion records by door reference, including outstanding and no-access items.
Agree the handover pack before work starts. It should follow your door references so you can match every finished opening to the original finding or schedule line.
A useful pack records the action taken on each door, the products and components used where relevant, any product documentation supplied, agreed photographs and a clear list of no-access or outstanding items with the next step for each.
If your organisation requires insurance evidence, references or pre-qualification, ask for them as part of the tender and verify them directly. Ask for references relevant to your type of building. Any scheme membership or certification a contractor claims can be checked with the body that operates it.
This page does not list legal requirements for contractors; your fire risk assessment, responsible person duties, insurer and client brief set the expectations for your building.
Pages that help you brief and compare contractors.
Send your report, action list or door schedule. We will answer your scope questions in writing and provide a repair and replacement quotation against your door references.