The time between deciding a fire door needs replacing and having it fitted depends on decisions made before the order and on confirmation from the supplier afterwards. This guide explains what has to be settled, why a dependable date follows a confirmed scope, and what you can send to avoid avoidable delay. It does not give standard lead times, because there is no single figure that would be reliable for your order.
1
Your enquiry, existing report or action list, photographs and site information.
2
Confirming which doors are being replaced and measuring the openings.
3
Performance, configuration, finish and hardware agreed.
4
Client approves scope, price and any submittals.
5
Order placed; supplier or manufacturer confirms its date.
6
Delivery and installation sequenced with site access.
A formal fire door inspection report, arranged through our external specialist partner, identifies defects and recommendations. It does not usually contain the precise measurements needed to order a doorset. Our site visit is separate: it confirms scope and takes measurements for pricing and ordering. It is not an inspection and does not produce a report. Knowing which you are waiting for helps you see where time is going.
None of these always lengthens the programme; each is something that has to be decided before an order can be placed and confirmed.
Many programmes wait on approvals rather than on manufacture. A client may need committee, landlord, freeholder or leaseholder agreement; a design team or building control body may need to see information; listed buildings may need consent. Those responsibilities sit with the client and their advisers. A programme should show where it depends on them.
Once a delivery date is confirmed, fitting has to match site access. In occupied buildings, doors may be fitted in phases around residents, trading hours or bookings, and delivery may be staged so materials are not stored on site for long. Changes after ordering, such as a different finish or added hardware, can affect both supply and fitting dates.