Snagging
Logging what you can see
A client, clerk of works or building manager records apparent issues at or after handover so they can be put right.
Problem-Solving Guide
Fire doors in new and refurbished buildings often arrive at handover with small but important faults: doors that do not close, seals left off, gaps out of tolerance or hardware swapped on site. This guide explains how to log apparent issues usefully and how remedial work is scoped. Logging snags is not a formal inspection; formal fire door inspections and reports are arranged through an external specialist partner.
Snagging
A client, clerk of works or building manager records apparent issues at or after handover so they can be put right.
Formal inspection
A structured door-by-door assessment by a specialist inspector, with a written report. Arranged through our external partner.
Parsec
We verify the scope of logged issues on site for pricing and carry out the remedial work. We do not issue inspection reports.
A useful snag entry gives the door a reference, says where it is, describes what you can see and includes a photograph. 'Corridor door 2.04 does not latch when released from fully open; photo attached' is far more useful than 'doors not closing'.
Describe what you see, not the cause. A door that will not latch might need closer adjustment, a different keep, hinge work or frame correction. Diagnosis is part of scoping.
Illustrative only, not a completed job: after a small refurbishment, the building manager logs ten doors. Six do not close fully, two have seals painted over, one has a gap under the leaf after new flooring, and one has a non-matching lock.
Our visit verifies each entry for pricing. Six closer adjustments and two seal renewals are defined repairs. The trimmed-gap door is checked against the doorset information: if the gap cannot be corrected within the supported method, replacement is quoted. The lock is replaced with a compatible one. Each line keeps the building manager's reference.
In many projects, snags reported within the defects period are for the original contractor to correct. Check your contract first. If you instruct a different contractor without following the contract process, it may affect your position. We do not advise on contracts; we price the work when you are ready to instruct.
Send your snagging list with door references and photographs. We will verify the scope and provide a written remedial quotation.